5052 5083 3003 H14 Aluminum Alloy Pipe Tube WT 1-40mm Hydraulic Systems Heat Conductive

Place of Origin CHINA
Brand Name JBHD
Certification ISO,SGS
Model Number 3003/7075
Minimum Order Quantity 1 ton
Price Negotiable
Packaging Details Standard seaworthy export packing or as customer demands
Delivery Time 7-15 work days
Payment Terms T/T, Western Union
Supply Ability 10000 Ton/Tons per Month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Product Name Heat Conductive Aluminum Alloy Pipe Grade 3003/7075
Thickness 0.2mm~20mm Length 2m,3m,5.8m,6m,or As Required
Surface Mill Finish, Anodized, Polished Etc Tolerance ±1%
Service Accept OEM Price Term EXW FOB CIF CFR
High Light

3003 aluminum pipes JBHD

,

5052 aluminum pipes JBHD

,

3003 h14 aluminum tubes JBHD

Leave a Message
Product Description

 

What is the difference between aluminum pipe and aluminum tube?

Aluminum pipe is defined by its internal diameter (ID) or bore because it's used for transporting fluid or other media. The ID matters because that determines the capacity of the pipe, which is usually the property of greatest interest to the buyer. Aluminum round tube is defined by its outside diameter (OD).

Product Description 

Item
Aluminium pipe/aluminum tube
Standard
GB/T6893-2000,GB/T4437-2000,ASTM B210,ASTM B241,ASTM B234,
JIS H4080-2006,etc
Material
1060,1200,1100,2024,2124,3003,3004,5050,5083,5154,5454,5652,5086,
5056,5456,5754,6061,6062,6063,7075,etc
OD
2-2500mm
WT
0.5-150mm
Length
1m~12m or as required
Surface
Oxidation, electrophoresis coating, fluorine carbon spraying, powder coating, wood grain transfer printing, mechanical drawing, mechanical polishing, sand blasting
Price term
Ex-Work,FOB,CFR,CIF
Payment term
TT,L/C,or as customrers required
MOQ
5 Tons or as customers required
Package
Standard export package,or as required
Export to
India,Indonesia,Ukraine,Malaysia,Korea,Thailand,Brazil,South Korea,Korea,
South Africa,Singapore,Canada,USA,Spain,Mexico,Kuwait,Peru,Italy ,Nigeria,etc
Application
Aluminum tube is widely used in all walks of life, such as: automobile, ship, aerospace, aviation,
electronics, agricultural and mechanical and electrical, home, etc
Container
Size
20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High)
40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High)
40ft HC:12032mm(Lengh)x2352mm(Width)x2698mm(High)
 

 

5052 5083 3003 H14 Aluminum Alloy Pipe Tube WT 1-40mm Hydraulic Systems Heat Conductive 0

5052 5083 3003 H14 Aluminum Alloy Pipe Tube WT 1-40mm Hydraulic Systems Heat Conductive 1

 

 

Package

5052 5083 3003 H14 Aluminum Alloy Pipe Tube WT 1-40mm Hydraulic Systems Heat Conductive 2

Shipping:
1. WORLDWIDE SHIPPING. (Except some countries and APO/FPO)
2. Goods delivered by 20" , 40" FCL/LCL by quantity or customer's request.
3. Customers specifying freight forwarders or negotiable shipping methods!
4. Delivery Time: 10-30days after conformed or according to quantity.

 

 

Application
 
5052 5083 3003 H14 Aluminum Alloy Pipe Tube WT 1-40mm Hydraulic Systems Heat Conductive 3
Company Introduction
5052 5083 3003 H14 Aluminum Alloy Pipe Tube WT 1-40mm Hydraulic Systems Heat Conductive 4
5052 5083 3003 H14 Aluminum Alloy Pipe Tube WT 1-40mm Hydraulic Systems Heat Conductive 5
 

 

FAQ:

Q1: What's your terms of payment?
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.


Q2: What's the terms of delivery?
A: EXW, FOB, CFR, CIF


Q3: What's your delivery time?
A: For stocks, we could transport the goods to loading port within 15 work days after we received the deposit.For productionperiod, it usually takes about 15 days to 30 days after we received the deposit.


Q4: Could you produce according to the samples?
A: Yes, we can customer-made by your samples or technique drawings.


Q5: Could youprovide the compliment samples?
A: Yes, we could provide the free samples on condition that it is available in stocks, however,the transportation fee is borne by buyer.