Place of Origin:
CHINA
Brand Name:
JBHD
Certification:
ISO,SGS
Model Number:
3003/7075
Contact Us
Product Description
Item
|
Aluminium pipe/aluminum tube
|
|||
Standard
|
GB/T6893-2000,GB/T4437-2000,ASTM B210,ASTM B241,ASTM B234,
JIS H4080-2006,etc |
|||
Material
|
1060,1200,1100,2024,2124,3003,3004,5050,5083,5154,5454,5652,5086,
5056,5456,5754,6061,6062,6063,7075,etc |
|||
OD
|
2-2500mm
|
|||
WT
|
0.5-150mm
|
|||
Length
|
1m~12m or as required
|
|||
Surface
|
Oxidation, electrophoresis coating, fluorine carbon spraying, powder coating, wood grain transfer printing, mechanical drawing, mechanical polishing, sand blasting
|
|||
Price term
|
Ex-Work,FOB,CFR,CIF
|
|||
Payment term
|
TT,L/C,or as customrers required
|
|||
MOQ
|
5 Tons or as customers required
|
|||
Package
|
Standard export package,or as required
|
|||
Export to
|
India,Indonesia,Ukraine,Malaysia,Korea,Thailand,Brazil,South Korea,Korea,
South Africa,Singapore,Canada,USA,Spain,Mexico,Kuwait,Peru,Italy ,Nigeria,etc |
|||
Application
|
Aluminum tube is widely used in all walks of life, such as: automobile, ship, aerospace, aviation,
electronics, agricultural and mechanical and electrical, home, etc |
|||
Container
Size |
20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High)
40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High) 40ft HC:12032mm(Lengh)x2352mm(Width)x2698mm(High) |
Advantages of aluminum tubes
Advantages of welding technology: The welding technology of thin-walled copper-aluminum pipes suitable for industrial production is known as a world-class problem, and it is the key technology for replacing aluminum with copper for air-conditioning connecting pipes.
Service life advantage: From the perspective of the inner wall of the aluminum tube, since the refrigerant does not contain water, the inner wall of the copper-aluminum connecting tube will not be corroded.
Energy-saving advantages: The lower the heat transfer efficiency of the connecting pipeline between the indoor unit and the outdoor unit of the air conditioner, the more energy-saving, or the better the thermal insulation effect, the more power-saving.
Excellent bending properties, easy to install and move.
FAQ:
Q1: What's your terms of payment?
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.
Q2: What's the terms of delivery?
A: EXW, FOB, CFR, CIF
Q3: What's your delivery time?
A: For stocks, we could transport the goods to loading port within 15 work days after we received the deposit.For productionperiod, it usually takes about 15 days to 30 days after we received the deposit.
Q4: Could you produce according to the samples?
A: Yes, we can customer-made by your samples or technique drawings.
Q5: Could youprovide the compliment samples?
A: Yes, we could provide the free samples on condition that it is available in stocks, however,the transportation fee is borne by buyer.
Send your inquiry directly to us